Since 2011, specialized in

PROJECT MANAGEMENT in industrial dismantling

Featured Projects
Port of Las Palmas GC
Complete dismantling of 6 port cranes in the port of Las Palmas GC
TONS of equipment 2.100 MAX. HEIGHT of equipment 70M MAX. WEIGHT of equipment 60Tn MATERIALS Copper, Ferrous materials, Engines WASTE Oils, Structural concrete CRANES 2 mobile cranes (800Tn / 500Tn) DURATION 2,5 months
messer
Complete disassembly of CMG1 air separation column
MESSER Vila-seca
TONS of equipment 450 MAX. HEIGHT of equipment 65M MAX. WEIGHT of equipment 60Tn MATERIALS Copper, Ferrous materials, Stainless steel, Engines WASTE Oils, Non-hazardous waste, Structural concrete CRANES 3 mobile cranes (400Tn / 100Tn) DURATION 4 months
ERCROS
Complete decommissioning of acetaldehyde plant
for ERCROS
TONS of equipment 3.500 MAX. HEIGHT of equipment 50M MAX. WEIGHT of equipment 85Tn MATERIALS Copper, Ferrous materials, Stainless steel, Titanium, Aluminum, Engines CRANES Engines, Ceramics, Mineral wool, Oils CRANES 5 mobile cranes (800Tn / 500Tn / 2x220Tn / 100Tn) DURATION 6 months
APM Terminals
Dismantling of 10 straddle carriers for the
APM Barcelona Port terminal
TONS of equipment 565 MAX. HEIGHT of equipment 11M MAX. WEIGHT of equipment 58Tn MATERIALS Ferrous materials, Engines WASTE Oils, Diesel fuel, Tires CRANES 1 mobile crane (220Tn) DURATION 1,5 months
kemira
Complete dismantling of Tarragona Port plant for
Kemira
TONS of equipment 2.000 MAX. HEIGHT of equipment 15M MAX. WEIGHT of equipment 15Tn MATERIALS
Copper, Ferrous materials, Stainless steel, Engines
WASTE Asbestos, Non-hazardous waste, Polyester, Oils CRANES 3 mobile cranes (220Tn / 2x100Tn) DURATION 2,5 months
ERSHIP
Dismantling of mobile plant vacuum cleaner from BULK Port of TGNA for ERSHIP - JULY 2019
TONS OF EQUIPMENT 700 Ton MAX. HEIGHT OF EQUIPMENT 40m MAX. WEIGHT OF EQUIPMENT 206 Ton MATERIALS Ferric, copper, motors WASTE Oils, valvulin, concrete counterweights, rubber conveyor belts CRANES 2 400 and 500 Ton self-cranes + a 600 Ton mobile port crane DURATION 2 months
KEMIRA
Complete demolition of copper recovery plant and solar conditioning for KEMIRA in Flix-TGNA - NOVEMBER 2018
TONS OF EQUIPMENT 250 Ton MAX. HEIGHT OF EQUIPMENT 12m MAX. WEIGHT OF EQUIPMENT 12 Ton MATERIALS Ferric, copper WASTE Demolition concrete, plastics CRANES 120 Ton crane DURATION 2 months
DP WORLD
Weakening of structure and collapse controlled by the collapse of two STS Panamax machines for Dubai Ports World DPW TGNA - JULY AND AUGUST 2019
TONS OF EQUIPMENT 1200 Ton MAX. HEIGHT OF EQUIPMENT 65m MAX. WEIGHT OF EQUIPMENT 625 Ton MATERIALS Ferric, copper, motors WASTE Oils, valvulin, concrete counterweights CRANES 80Tn cranes support for disassembly spreader + cable pull placement DURATION 2 months
EUROPORTS
Dismantling of two STS IMENASA disused cranes for TPS EUROPORTS in TGNA PORT - APRIL 2019
TONS OF EQUIPMENT 550 Ton MAX. HEIGHT OF EQUIPMENT 40m MAX. WEIGHT OF EQUIPMENT 82 Ton MATERIALS Ferric, copper, motors WASTE Oils, valvulin, concrete counterweights CRANES 1 400 ton truck DURATION 3 weeks
NOATUM
Disassembly of two PICOPATO cranes for NOATUM TERMINALS in TGNA PORT and GRAO CASTELLÓ - MAY AND JUNE 2019
TONS OF EQUIPMENT 400 Ton MAX. HEIGHT OF EQUIPMENT 50M MAX. WEIGHT OF EQUIPMENT 75 Ton MATERIALS Ferric, copper, motors WASTE Oils, valvulin, concrete counterweights CRANES 2 cranes 400 and 205Ton + support cranes: 80 Ton with basket and 160 Ton DURATION 3 weeks